Watch this short video to see how The Generator Company carried out this project. 20 year old generators required replacing at Exchange House and therefore the renewal of backup generator capacity was required. It was decided that building’s infrastructure needed more resilience and therefore the generating capacity in the building needed to be improved, upgraded

550kVA Diesel Generator Installation
550kVA Diesel Generator Set Project Brief To design, manufacture, install and commission a 550kVA standby generator to be installed at roof level...