Alternator Rebuild at Power Station in Antigua Harbour
Alternator Rebuild at Power Station in Antigua harbour The Project Following a tropical storm, the generator power station was flooded with approximately 450mm of water. The site engineers shut down the generator power station and switched off the main supply causing a complete power outage throughout the complex. The Generator Company responded to the